The details of option 1 are presented below.
Cut-fill maps have been created at a 1/10th foot drop per 100 feet with a cut-fill ratio of 1.3.
The cut fill map for option 1 is given below.

Tags: cut-fill, estimation, Piping
The details of option 1 are presented below.
Cut-fill maps have been created at a 1/10th foot drop per 100 feet with a cut-fill ratio of 1.3.
The cut fill map for option 1 is given below.

Tags: cut-fill, estimation, Piping